OUR PROCESS

From Project Input to Completed Columbarium

Every columbarium project begins with different conditions.
Dongsheng develops each project step by step — from understanding the site, space and capacity requirements to design, engineering, manufacturing, installation and final handover.

PLAN → DESIGN → ENGINEER → MANUFACTURE → INSTALL → HANDOVER

01 — PLAN

UNDERSTAND THE PROJECT

We start with what you have — a floor plan, architectural drawing, site dimensions, target capacity or an initial project concept.

The first step is to understand the space, project requirements and overall direction before developing the system.

  • Site & Space
  • Target Capacity
  • Project Type
  • Design Direction

02 — DESIGN

DEVELOP THE LAYOUT & SYSTEM

Based on the project requirements, we develop the niche layout, capacity, system configuration, materials and finishes.

This is where the architectural concept and the columbarium system begin to work together as one complete solution.

  • Layout & Capacity
  • Niche Configuration
  • Materials & Finishes
  • Architectural Coordination

03 — ENGINEER

TURN THE DESIGN INTO A BUILDABLE SYSTEM

Once the design direction is confirmed, it is translated into the technical details required for production and installation.

Dimensions, structures, connections and interfaces are coordinated so that what is designed can also be manufactured, assembled and installed correctly.

  • Technical Drawings
  • Dimensions & Interfaces
  • Structural Details
  • Production Preparation

A GOOD DESIGN MUST ALSO BE BUILDABLE.

04 — MANUFACTURE

BUILD THE SYSTEM

Approved project details move into fabrication, finishing, assembly and quality inspection.

Where appropriate, key components or modules can be pre-assembled or trial-fitted before shipment to improve consistency and simplify site installation.

05 — INSTALL

FROM FACTORY TO SITE

At the project site, the columbarium system is positioned, assembled and adjusted in coordination with the surrounding architectural works.

Depending on the project scope, Dongsheng can provide installation guidance, on-site coordination or installation support.

06 — HANDOVER

READY FOR OPERATION

After installation and final checks, the completed system moves into handover and operation.

Dongsheng can provide project handover, training and ongoing technical support. Where required, digital management and access-control solutions can also be integrated into the completed columbarium system.

  • Final Checks
  • Project Handover
  • Training
  • Ongoing Support
START WITH WHAT YOU HAVE

A floor plan, target capacity or initial idea is enough to begin.